Monday, 3 June 2013

On how long it takes me to disassemble Leonardo for shipping

People have sometimes asked me how long it takes me to prepare Leonardo for shipping. In the past, I have been unable to give a proper answer. However, this evening I decided to time myself. With tools laid out and a large bike box at the ready, it took me a bit under 24 minutes.  It takes longer with a smaller box as fitting the bike into the box just so is much more fiddly. The box isn't sealed but that can wait as there are still bits to go into it.

2 comments: